Structural price list items added for the March 2022 price lists

1. PLMSWRSGSteam shower/bath generator – up to 8kw
(+)Included: Steam generator, control, steamhead, and labor to install.Quality: Steam generator, up to 8.9kw, with control and polished nickel steamhead or equal.Included: Labor to remove steam generator and control with steam head and to discard in a job-site waste receptacle.(-)
2. PLMSWRSG>Steam shower/bath generator – 9kw to 15kw
(+)Included: Steam generator, control, steamhead, and labor to install.Quality: Steam generator, 9kw to 15kw, with control and polished nickel steamhead or equal.Included: Labor to remove steam generator and control with steam head and to discard in a job-site waste receptacle.(-)
3. RFGADDRFAdd. layer of felt/underlayment, remove & disp.
(-)Included: Dump fees, hauling, disposal, and labor to remove additional layers of felt/underlayment.Notes: This item should be used if additional/multiple layers of felt/underlayment are to be removed and disposed of (i.e., more layers than the
standard/common installation practices for felt/underlayment; this item is not intended to be used for the base layer of felt already being removed
with the roofing material). Price per additional layer; however, removing multiple layers of felt may have some efficiencies, estimators should review
and compare their specific costs and make adjustments if necessary. Removal cost is based on hauling done with contractor’s own equipment. If haul
off is to be estimated separately or if the removal is being estimated with a dumpster (DMO DUMP*) or other equipment, use item RFG ADDRFN.
4. RFGADDRFNAdd. layer of felt/underlayment, remove (no haul off)
(-)Included: Labor to remove additional layers of felt/underlayment.Excluded: Haul off and dump fees.Notes: This item should be used if additional/multiple layers of felt/underlayment are to be removed (i.e., more layers than the standard/common
installation practices for felt/underlayment; this item is not intended to be used for the base layer of felt already being removed with the roofing
material). Price per additional layer; however, removing multiple layers of felt may have some efficiencies, estimators should review and compare
their specific costs and make adjustments if necessary.
5. WTRCTTLTear out non-salv. tile countertop & bag for disposal
(-)Included: Plastic bags and labor.Excluded: Tear out/removal of subdeck.Notes: Labor cost to remove and bag non-salvageable tile countertop and to discard in a job-site waste receptacle.
6. WTRCTTLATear out non-salv. tile countertop & bag for disp- aft hrs
(-)Included: Plastic bags and labor.Excluded: Tear out/removal of subdeck.Notes: Labor cost to remove and bag non-salvageable tile countertop and to discard in a job-site waste receptacle. A premium charge
is used after normal business hours.
7. WTRCTTLNTear out non-salvageable tile countertop, no bagging
(-)Included: Labor cost to remove non-salvageable tile countertop and to discard in a job-site waste receptacle.Excluded: Bagging. Tear out/removal of subdeck.
8. WTRCTTLNATear out non-salv. tile countertop, no bagging – aft hrs
(-)Included: Labor cost to remove non-salvageable tile countertop and to discard in a job-site waste receptacle.Excluded: Bagging. Tear out/removal of subdeck.Notes: A premium charge is used after normal business hours.
9. WTRCTTLSTear out non-salv. tile countertop & bag – Cat 3 water
(-)Included: Plastic bags and labor.Excluded: Tear out/removal of subdeck.Reference: IICRC S500 5th Edition standards.Notes: Labor cost to remove and bag non-salvageable tile countertop and to discard in a job-site waste receptacle. A premium charge
is used when working with sewage contaminated materials.
10. WTRCTTLSATear out non-salv. tile countertop & bag-Cat 3 wtr-aft hr
(-)Included: Plastic bags and labor.Excluded: Tear out/removal of subdeck.Reference: IICRC S500 5th Edition standards.Notes: Labor cost to remove and bag non-salvageable tile countertop and to discard in a job-site waste receptacle. A premium charge
is used when working with sewage contaminated materials and after normal business hours.
11. WTRCTTLSNTear out non-salv. tile countertop, no bag – Cat 3 water (-)Included: Labor cost to remove non-salvageable tile countertop and to discard in a job-site waste receptacle.Excluded: Bagging. Tear out/removal of subdeck.Reference: IICRC S500 5th Edition standards.Notes: A premium charge is used when working with sewage contaminated materials.
12. WTRCTTLSNATear out non-salv. tile countertop, no bag- Cat 3- aft hrs
(-)Included: Labor cost to remove non-salvageable tile countertop and to discard in a job-site waste receptacle.Excluded: Bagging. Tear out/removal of subdeck.Reference: IICRC S500 5th Edition standards.Notes: A premium charge is used when working with sewage contaminated materials and after normal business hours.

Structural price list items modified for the March 2022 price lists

1. CLNFINAL*Modified text in Note field of (+) definition to help further clarify the intent of the item.
2. CLNJST*Modified text in Note field of (+) definition to clarify item would include cleaning all sides of exposed joists, including one side
of sheathing if present, and to clarify many factors could ultimately affect pricing.
3. DRYTEXModified labor component yield in (+) assembly.
4. DRYTEX-Modified equipment and labor component yields in (+) assembly.
5. DRYTEX+Modified labor component yield in (+) assembly.
6. DRYTEX++Modified labor component yield in (+) assembly.
7. DRYTEXMKModified equipment and labor component yields in (+) assembly.
8. HMRCLNJS*Modified text in Note field of (+) definition to clarify item would include cleaning all sides of exposed joists, including one side
of sheathing if present, and to clarify many factors could ultimately affect pricing.
9. LABCLN-RModified description to reference “per hour” to match similar items in the category.
10. PLMWHTE*Modified description to reference “kw” to match similar items.
11. WTRDRYMAAdded text to Note field of (+) definition to clarify the combination of this item added with an air mover item may also cover smaller
single-unit wall cavity drying equipment.

Structural material components added for the March 2022 price lists

1. PLMSTEAM>Steam generator – 9kw to 15kw
2. PLMSTEAMCSteam generator – control & steamhead
3. PLMSTEAMC+Steam generator – control & steamhead – High grade

Structural material components modified for the March 2022 price lists

1. PLMSTEAMModified description to reference steam kit up to 8kw.

Miscellaneous changes made for the March 2022 price lists

  • Remapped postal codes 55349, 55363, 55390 from the Saint Cloud, MN (MNSC) price list area to the Minneapolis, MN (MNMN) price list area.
  • Updated the Worker Wage portion of the Retail Labor Rates for various areas in United States and Canada.

Future changes and additions to look for in upcoming price list publications

  1. Item(s) for full home surge protector.
  2. Item(s) for dry fogging for mold.
  3. Possible item(s) / add-on item(s) for installing fencing in cold weather or difficult areas.
  4. Item(s) for drywall returns for commercial windows.